The long wait is nearly over.  We dropped by our machinist to inspect the first parts rolling off the mill.  Shown at the left is a small sample of the batch of motor pods and top plates.

The first side was completed, and they're ready to be "flipped" over to machine the other side.

We expect all of the parts for our first batch of Savoie turntables to be complete by mid-April.

Then, it's off to the finishers for the custom color of your choosing!

We revised our drawing submission process, and today represented a key milestone.  The test fit of the circuit board (photo below) was spot on!

Galibier Design - Motor Pod in Progress

click to enlarge

Galibier Design - Motor Controller Top Plate in Progress

click to enlarge

Related Posts

Savoie Drive Calibration

Savoie Drive Calibration

NiWatt Amplifier Build – Part 3

NiWatt Amplifier Build – Part 3

NiWatt Amplifier Build – Part 2

NiWatt Amplifier Build – Part 2

A Pass Labs XA-25 Demo With Rockport Speakers

A Pass Labs XA-25 Demo With Rockport Speakers

Thom


Your Signature

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

Never miss a good story!

 Subscribe to our newsletter to receive a sample setup report we created for a customer.

Subscribers also receive discounts on all accessories, including Audiodesk, Feickert and AnalogMagik. 


This report is in 3 sections:  


Documentation of the customers's setup and QC

30 pages packed with general setup information - tricks you may not have seen before
An appendix with a guide to tools and other setup tips, including how build your own azimuth gauge


Click the photo below, to subscribe.

Galibier Design - Setup Tools and Charts (Composite Photo)

Click for Free Setup Report