The long wait is nearly over.  We dropped by our machinist to inspect the first parts rolling off the mill.  Shown at the left is a small sample of the batch of motor pods and top plates.

The first side was completed, and they're ready to be "flipped" over to machine the other side.

We expect all of the parts for our first batch of Savoie turntables to be complete by mid-April.

Then, it's off to the finishers for the custom color of your choosing!

We revised our drawing submission process, and today represented a key milestone.  The test fit of the circuit board (photo below) was spot on!

click to enlarge

click to enlarge

Related Posts

NiWatt Amplifier Build – Part 3

(click to enlarge)This is part 3 of our NiWatt build log (installment #2 is here).  We’re nearing the finish line with about 3 hours’ work remaining for each amplifier. The observant reader will note that this is a photo of the right ampifier (note the binding post and output transformer location on the left side of

Read More

NiWatt Amplifier Build – Part 2

NiWatt Build in Progress (click to enlarge)Part 2 of our NiWatt build log (installment #1 is here).  At this point, in the build, about 7 hours’ work remains for each amplifier.   Shown here are the glass/fiber epoxy boards after “staking” the turrets: 3 boards for each amplifier.   Preparing boards to the point shown here

Read More

A Pass Labs XA-25 Demo With Rockport Speakers

(click to enlarge)We just demo’d a Pass Labs XA-25 amplifier at a customer’s house. The amplifier showed its pedigree, with all of the clarity, delicacy and nuance you’d expect from a Pass Labs design. At the same time, the Rockport speakers showed how power hungry they are. While the amps never sounded stressed (up to sane, but loud

Read More

Thom


Your Signature

Never miss a good story!

 Subscribe to our newsletter to receive a sample setup report we created for a customer.

Subscribers also receive discounts on all accessories, including Audiodesk, Feickert and AnalogMagik. 


This report is in 3 sections:  


Documentation of the customers's setup and QC

30 pages packed with general setup information - tricks you may not have seen before
An appendix with a guide to tools and other setup tips, including how build your own azimuth gauge


Click the photo below, to subscribe.

Click for Free Setup Report